Home Videos Solutions Concentrate Dehydration process of Lead-zinc Beneficiation Plant in Tibet

Concentrate Dehydration process of Lead-zinc Beneficiation Plant in Tibet

2016-08-30   XinHai    Views (2191)

Concentrate Dehydration process of Lead-zinc Beneficiation Plant in Tibet, Xinhai

La Norma lead zinc mine, located in Kare Town, Chamdo County, Tibet Autonomous Region, is a 600 thousand t/a plant EPC project undertook by Shandong Xinhai Mining Technology & Equipment Inc. The whole plant is composed of four workshops including crushing & screening workshop, grinding workshop, flotation workshop and concentrate dehydration workshop.

In Concentrate Dehydration Workshop, the two- phase mechanization dehydration technological process is used for both lead-antimony concentrate and zinc-sulfur concentrate. The first phase adopts updated high-efficiency thickener for preliminary dehydration. The flotation concentrate is conveyed into thickener by pump. The solid particle suspended in slurry settles down by gravity. The sludge at bottom is continuously scrapped to center discharge port by scraping rake and discharged. The second phase adopts ceramic filter and the water content of final concentrate is 9%.

Watch the 3D demo video and see how the process proceeds.

Latest Videos

  • Concentrate Dehydration process of Lead-zinc Beneficiation Plant in Tibet

    Concentrate Dehydration process of Lead-zinc Beneficiation Plant in Tibet

  • Induction to Main Equipment and Solution Used in Gold Processing Plant Project

    Induction to Main Equipment and Solution Used in Gold Processing Plant Project

  • 5td Gold Mobile Gravity Separation plant for Mineral Processing

    5t/d Gold Mobile Gravity Separation plant for Mineral Processing

  • 5td Mobile Gold CIL Plant for Gold Ore Processing

    5t/d Mobile Gold CIL Plant for Gold Ore Processing

Leave Message
contact
  • *
  • *
  • *
  • *
  • *
  • *
  • *